Locrian99's latest activity

  • Locrian99
    Locrian99 replied to the thread Tommy III volume mod.
    Leaving the 18k the same and using a b taper for the volume pot would give it more of a log. Taper then? I don’t currently have a...
  • Locrian99
    Locrian99 replied to the thread Re: Muffinator.
    Red leds are fantastic in a muff. 4148’s compress and give so much “hair” do you really need more that a germ or work alike would...
  • Locrian99
    Locrian99 reacted to Chuck D. Bones's post in the thread Re: Muffinator with Like Like.
    But seriously folks... The description states: The Muffinator Fuzz is identical to the PedalPCB Muffin Fuzz, with the addition of...
  • Locrian99
    Locrian99 replied to the thread Wire Wars.
    I think it’s cbazy. I have only had it break on me when ive really put it through some paces troubleshooting, of course i swore off...
  • Locrian99
    Locrian99 replied to the thread Wire Wars.
    I have been buying the solid core silicone in those amazon boxes for years the 24 awg. Not needing strippers to strip is heavenly...
  • Locrian99
    Locrian99 reacted to Robert's post in the thread Jlcpcb and tariffs with Sad Sad.
  • Locrian99
    Locrian99 replied to the thread Jlcpcb and tariffs.
    Man i didnt even think of ordering diodes and trannies from ukraine before this newest change.
  • Locrian99
    Locrian99 replied to the thread Jlcpcb and tariffs.
    I believe the big beautiful bill did away with de minimis so i dont think that will be in the ruling. I didnt research any further...
  • Locrian99
    Locrian99 replied to the thread Jlcpcb and tariffs.
    Of note slow boat shipping for one batch of boards is now $6.12. 8.62 for 5 pcbs now. On the 22nd i ordered 10 and shipping was...
  • Locrian99
    Locrian99 replied to the thread Jlcpcb and tariffs.
    The tariffs are charged by the shipping company are they not? Edit: the tariff fee is handled by the shipping company.
  • Locrian99
    Locrian99 replied to the thread Jlcpcb and tariffs.
    I would think they do the powder coats in batches. Which finish was it? I inow they mention on a few they can take longer.
  • Locrian99
    Locrian99 replied to the thread Jlcpcb and tariffs.
    Received my order from 8/2 last week. It was 25-30 enclosures…
  • Locrian99
    Locrian99 replied to the thread Jlcpcb and tariffs.
    I think big monk has been being a bit of a devils advocate on this. As we all freak out keeping it a bit grounded that we will still...
  • Locrian99
    Locrian99 replied to the thread Jlcpcb and tariffs.
    This is 30 125b size enclosures. So about double. It really only comes out to 1.5$ per pedal though in difference so its not end of...
    • IMG_1157.jpeg
  • Locrian99
    Locrian99 replied to the thread Jlcpcb and tariffs.
    And yea my last enclosure order took 3 weeks. Ups was 40$ it was probabky 25 enclosures.
Back
Top