Lytt Effects
Active member
Hey all,
I did some digging but didn’t find anything that addressed what I need help with.
I’m in the middle of a build of the Super 64 (JHS Superbolt), which has three J201 transistors along with three trim pots. Two of the trim pots on the parts list are listed at 100K, while the third is listed at 50K.
I flubbed up and accidentally orders 5K trim pots instead of 50K pots, so I’m in need of some information on how much the trim pot value matters here. I’m a bit of a novice when it comes to circuit design and schematics, so outside of knowing what value needs to go where, I’m a bit lost.
I have 100K trimmers on hand, as well as the 5K that I accidentally ordered. What would happen when using one of these in place of the 50K that is called for? I have other builds that call for 50K trimmers as well, so I will be ordering some anyway, but I’m curious as to why one of these is 50K while the other two are 100K, and what may happen when using a 100K or 5K versus the 50K. Any help would be greatly appreciated. Thanks!
(Attached schematic for reference)
I did some digging but didn’t find anything that addressed what I need help with.
I’m in the middle of a build of the Super 64 (JHS Superbolt), which has three J201 transistors along with three trim pots. Two of the trim pots on the parts list are listed at 100K, while the third is listed at 50K.
I flubbed up and accidentally orders 5K trim pots instead of 50K pots, so I’m in need of some information on how much the trim pot value matters here. I’m a bit of a novice when it comes to circuit design and schematics, so outside of knowing what value needs to go where, I’m a bit lost.
I have 100K trimmers on hand, as well as the 5K that I accidentally ordered. What would happen when using one of these in place of the 50K that is called for? I have other builds that call for 50K trimmers as well, so I will be ordering some anyway, but I’m curious as to why one of these is 50K while the other two are 100K, and what may happen when using a 100K or 5K versus the 50K. Any help would be greatly appreciated. Thanks!
(Attached schematic for reference)