Bricksnbeatles
Member known well
Anyone have a source for LEDs with longer than usual leads? I’m getting tired of having to solder lengths of wire or clipper resistor leads to my LEDs so they can reach the pads on footswitch daughterboards. They’re always just 5 or 6 mm too short to reach.
Anyone know of a supplier whose LEDs have leads that are on the longer side? Thanks in advance
Anyone know of a supplier whose LEDs have leads that are on the longer side? Thanks in advance
