Long-lead LED

Bricksnbeatles

Member known well
Anyone have a source for LEDs with longer than usual leads? I’m getting tired of having to solder lengths of wire or clipper resistor leads to my LEDs so they can reach the pads on footswitch daughterboards. They’re always just 5 or 6 mm too short to reach.

Anyone know of a supplier whose LEDs have leads that are on the longer side? Thanks in advance
 

“this is NOT an led” but they look long.
 
Last edited:
I keep a small stock of pre-wired LEDs on hand for just this sorta thing. I get the Chanzon brand from amazon
 
Back
Top