Not sure if this is the right section to mention it, but I Just built the face melter, and when I went to put it in the case that I drilled as per the build document, I had to attach flying leads to the indicator LED as the document template has the LED close to the switch, but the pads on the board are oriented for placing between the top 2 knobs.