And I thought my backlog of 30 boards was bad!Literally about to build a spreadsheet to do an inventory on build I have.. That way I can give it a quick glance on what I wanna build as priority... I have at least 100-125 boards and not many duplicates..![]()
I know for sure there are some guys in here that have hundreds...lolAnd I thought my backlog of 30 boards was bad!
sooo me..... I have every value I need except for that one to actually finish the build...lolYeesh.
I'd make a spreadsheet for all my pedals, if I was boring.
Like, that way I might actually get all the parts that I need from one mouser order instead of spacing out three different orders, wasting cash on shipping costs, and delaying completion of various projects.
Nah dudes. I do it SMART.
Welcome to the club, and the other club, too.sooo me..... I have every value I need except for that one to actually finish the build...lol
LightweightLiterally about to build a spreadsheet to do an inventory on build I have.. That way I can give it a quick glance on what I wanna build as priority... I have at least 100-125 boards and not many duplicates..![]()
One thing I will NEVER do is anything to do with spreadsheets!
My problem is I’m allergic to them. I think spreadsheets are cool, I just can’t handle them without flaring up. Instead I tap and drag things around like a cavemanI have a spreadsheet of all my pedal projects with 10+ tabs. Also a spreadsheet for parts orders.
Feeling offended by the spreadsheet-less jocks here.
That looks like Trello. That takes me back.My problem is I’m allergic to them. I think spreadsheets are cool, I just can’t handle them without flaring up. Instead I tap and drag things around like a caveman
View attachment 85497